Resources

Show Filters
Hide Filters

Types

Categories

Showing 6 Results.

Reset Filters
Case StudiesProducts
Muffin Monster
30K In-line Muffin Monster4-HYDRO Open-channelCase StudiesCorrectionsIndustrial ProcessingMunicipal GrindersMunicipal WastewaterPump StationsSludge Processing
Muffin Monster – San Bernardino, CA
View
Case StudiesProducts
10k Muffin Monster
10K In-line Muffin MonsterCase StudiesMunicipal GrindersMunicipal WastewaterSludge Processing
10K Muffin Monster Takes Over When Macerator Can’t Cut It – Schertz, TX
View
Case StudiesProducts
Case Study: Muffin Monster Protects Spanish Biogas Facility
3-HYDRO In-line30K In-line Muffin MonsterDigestion & BiogasIndustrial GrindersIndustrial ProcessingSludge Processing
Case Study: Muffin Monster Protects Spanish Biogas Facility
View
Case StudiesProducts
Sludge Thickening | Durango Foils Energy Heist and Lowers Maintenance Costs
Case StudiesMonster Drum ThickenerMunicipal WastewaterSludge Processing
Sludge Thickening – Durango, CO
View
Case StudiesProducts
How Chemistry and Mechanics Deliver Cost-Effective Waste Treatment
Case StudiesMonster Drum ThickenerMunicipal WastewaterSludge Processing
Sludge Thickening – Brockville, ON WPCC Upgrades
View
Case StudiesProducts
Macerator Explodes, Monster Sludge Grinder Takes Over
10K In-line Muffin MonsterSludge Processing
Macerator Explodes, Monster Sludge Grinder Takes Over

Muffin Monster Takes Over When Macerator Can’t Cut It The Coeur D’Alene Wastewater Treatment Plant has been in operation since 1939. Since then, the facility has been overhauled significantly to keep […]

View

Contact a Representative

Find out more today about how JWC can fulfill your grinding, screening, shredding or processing needs.