Case Study: JWC Grinder saves Las Vegas apartment complex $20,000 in 90 days!

Problem: Frequent ejector pump clogs and malfunctions causing high maintenance costs

Solution: 3-HYDRO Open Channel Sewage Grinder

Approaching something the same way repeatedly rarely yields different results. Often times, it’s the consideration of a different perspective that enables ideal solutions. Such is the case at Villa Mountain Vista North Las Vegas – a 400-unit apartment complex with an on-site lift station equipped with stainless steel-bladed ejector pumps to transport sewage waste. While the pumping of sewage out to the municipal collections system should be fairly standard, the frequent ejector pump clogswere cause for concern. Typically, the solution involved replacing broken down pumps – at a cost of $3,000 to $3,500 each time – or installing larger pumps. These solutions didn’t solve the problem. Plumbing Enterprises representative Colin Pirrie understands why…

Continue reading here.