The Proof is in the Chart – Monster Grinders Eliminate Clogs Once and For All

A stunning chart shows the before and after performance of a pump station in Virginia. Since the installation of a 30K series Muffin Monster in 2013, the chart shows a dramatic decrease in the run time of the pumps.

The pumps are running more efficiently and the customer reports the pumps have not clogged once since installation of the Muffin Monster.

The utility is saving on electrical costs, maintenance costs and workers are protected from dealing with a clogged pump. Now that’s win, win, win.

Our local rep Watermark Environmental Systems was the equipment consultant on the project.