JWCE Wins Contract to Supply Entire Headworks System for Carrollton, Ohio

In mid-October JWCE received a large order from the City of Carrollton, Ohio for our complete Monster Separation System headworks. The order includes several large machines which pre-treat wastewater as it enters the City’s new wastewater treatment plant. The Monster Separation System will screen out, wash and convey rags, trash, plastics and grit before the debris ever has a chance of entering the facility.

The order includes:

The highly automated JWCE headworks system also includes these exclusive control systems:

  • Monster Blind Diagnostic System (patented) – for instantaneous updates on flow rates, screen blinding and automated headworks operation
  • MonsterTrack billing controller for the septage receiving system

Providing on-site assistance with the design, installation and start-up is Bergren Associates – JWCE’s representative for Northern Ohio.

Since 2003 JWCE has installed hundreds of perforated plate fine screens throughout America as wastewater treatment plants upgrade from bar screens to perf plate fine screens for their higher capture efficiency. The Screenings Washer Monster is designed to handle the heavier loads of debris and fecal matter associated with fine screening. The fine screen captures more debris than ever before and the SWM grinds it, washes it, cleans it  and compacts it. The SWM returns soft organics to the treatment plant flow where they belong.