JWCE Wins Large Order for Princeton, IL Wastewater Treatment Plant Upgrade

The wastewater treatment plant for the City of Princeton, Illinois is undergoing an upgrade and JWC Environmental has received a large order for our high-tech, high-flow Monster Separation System headworks. The plant treats over 2-MGD (88 l/s) to produce reclaimed water and biosolids suitable for land application.

The headworks will include dual stage screening to ensure the highest level of capture rate, flow and reliability. Equipment includes:

The plant’s unique design includes a vertical loop reactor and a high-tech sludge treatment system to reduce the amount of biosolids produced. The design engineer for the project is Crawford, Murphy & Tilly, with offices throughout the midwest.

Managing the order is Dean Wiebenga of Peterson & Matz – JWC’s long-time rep in Illinois.